Template
An RA bill format with measurements and certification checks
An Excel workbook with an RA bill abstract, a measurement sheet in the measurement book format and a certification checklist, with formulas for previous quantity, retention and net payable.
- Quantity is Number x Length x Breadth x Height, less the Deduction
- Retention and mobilization deductions work out net payable
- A certification checklist with the approval steps of the product
Download the RA bill template
Enter your name, work email and mobile number. The link to the Excel file appears as soon as the form is sent.
We could not confirm your request.
Your download
This download is sent on request. Email info@superwise.site and we reply with the file.
What the template contains
The workbook has four sheets. The RA bill abstract lists the BOQ items of the work order with the contracted quantity and rate, the quantity for this bill and the cumulative quantity billed so far. It works out the previous quantity, the amount and a check that no line goes over the contracted quantity, then the retention deduction, the mobilization deduction and net payable.
The Measurement sheet follows the measurement book: Number x Length x Breadth x Height gives Quantity, and Net quantity is Quantity less the Deduction. The Certification checklist holds seven checks to tick before submission and a grid for the approval steps. The Instructions sheet explains the order of work.
Tax appears at work order line level only. The sheet does not calculate GST, because that follows your contract and invoice rules.
RA bill header 8 columns
| Column | Product field | Documented in |
|---|---|---|
| Work order (contract number) | WorkOrderId | procurement/work-orders.md |
| Contractor | VendorId | procurement/work-orders.md |
| Bill no | BillNo | billing/ra-bills.md |
| Execution period start | ExecutionPeriodStart | billing/ra-bills.md |
| Execution period end | ExecutionPeriodEnd | billing/ra-bills.md |
| Retention percent | RetentionPercent | procurement/work-orders.md |
| Mobilization deduction | MobilizationDeduction | billing/ra-bills.md |
| Status | Status | billing/ra-bills.md |
RA bill abstract 11 columns
| Column | Product field | Documented in |
|---|---|---|
| BOQ item | ProjectBOQId | procurement/work-orders.md |
| Contracted quantity | WOQuantity | procurement/work-orders.md |
| Rate | Rate | procurement/work-orders.md |
| WO net amount | NetAmount | procurement/work-orders.md |
| WO tax amount | TaxAmount | procurement/work-orders.md |
| WO total amount | TotalAmount | procurement/work-orders.md |
| Quantity (this bill) | Quantity | billing/ra-bills.md |
| Cumulative quantity | CumulativeQuantity | procurement/work-orders.md |
| Previous quantity | PreviousQuantity | procurement/work-orders.md |
| Amount (this bill) | Amount | billing/ra-bills.md |
| Within contracted quantity | Check | procurement/work-orders.md |
Measurement 9 columns
| Column | Product field | Documented in |
|---|---|---|
| BOQ item | ProjectBOQId | billing/measurement-sheets.md |
| Description | Description | billing/measurement-sheets.md |
| Number | Number | billing/measurement-sheets.md |
| Length (m) | Length | billing/measurement-sheets.md |
| Breadth (m) | Breadth | billing/measurement-sheets.md |
| Height (m) | Height | billing/measurement-sheets.md |
| Quantity | Quantity | billing/measurement-sheets.md |
| Deduction | Deduction | billing/measurement-sheets.md |
| Net quantity | NetQuantity | billing/measurement-sheets.md |
Certification checklist 8 columns
| Column | Product field | Documented in |
|---|---|---|
| Step | StepNumber | general/approval-workflows.md |
| What is checked | Check sheet-only | procurement/work-orders.md (business rules) and general/approval-workflows.md |
| Approver role | ApproverRoleId | general/approval-workflows.md |
| Approval type | ApprovalType | general/approval-workflows.md |
| Status | Status | general/approval-workflows.md |
| Approver | ApproverId | general/approval-workflows.md |
| Action date | ActionDate | general/approval-workflows.md |
| Comments | Comments | general/approval-workflows.md |
How to use the template
Measure first, then bill. The abstract takes its quantities from the measurement, so filling it in that order keeps every figure traceable.
- Enter each measured line on the Measurement sheet. Use the Deduction column for openings.
- On the abstract, enter the contracted quantity and rate for each BOQ item, the quantity for this bill and the cumulative quantity. Previous quantity is calculated.
- Fill the retention percent and the mobilization deduction in the header. Retention deduction and net payable calculate themselves.
- Tick the checks on the Certification checklist, then record each approval step with the approver role, the approval type (Any or All), the approver, the date and comments.
Common mistakes in RA bills
Five errors send RA bills back for correction.
- A billed quantity with no measurement behind it. Every quantity in the abstract should trace to a measurement sheet.
- A cumulative quantity above the work order quantity. SuperWise does not allow it, and the template flags the line as Over WO quantity.
- Previous quantity typed in by hand. It is the cumulative quantity less the quantity of this bill, so let the formula do it.
- Retention taken on the wrong base. It is the bill Amount x retention percent / 100.
- A mobilization deduction with no link to the contract. Recover it as agreed, pro rata or as a lump sum.
Automate it in SuperWise
In SuperWise an RA bill runs against a work order. It carries the bill number, the execution period, the amount, the retention and mobilization deductions and a status that moves from Draft to Submitted, Approved and Paid. Quantities come from the measurement sheets, and the cumulative quantity of a line cannot exceed the work order quantity.
Approval steps run by role, with Any or All approvers, and each step records the approver, the date and comments. The checklist in the workbook mirrors that sequence.
Frequently asked questions
Is this the RA bill format my client will accept?
Not necessarily. Clients and PMCs often prescribe their own format. This workbook gives you a calculation you can trust and a checklist, and you can copy its figures into a prescribed format. Check the contract before you submit.
Does the template calculate GST?
No. It shows tax at work order line level only. Add GST as your contract and invoice rules require. SuperWise holds a default tax on the work order that applies to its RA bills.
What does the certification checklist cover?
It has seven checks for the billing engineer before submission: bill number, execution period, measurement trace, cumulative quantity, retention, mobilization and net payable. It also has a grid for the approval steps of your company, which you fill with your own roles.
Can the template handle milestone billing?
No. It follows measurement-based billing, which is the usual RA bill. SuperWise documents milestone billing as a separate path on the work order, and this workbook does not cover it.
See an RA bill built from measurement sheets
Book a demo and we take a bill from measurement to approval on the demo project.