Formwork (Shuttering)

The temporary mold that holds wet concrete in shape until it hardens, made of timber, plywood, steel or aluminium.

Last updated

What is Formwork (Shuttering)?

Formwork, commonly called shuttering on Indian sites, is the temporary mold into which wet concrete is poured and held until it hardens. It is made of timber, plywood, steel or aluminium, and it must be strong enough to carry the hydrostatic pressure of wet concrete without bulging or collapsing.

Practical example

For a high-rise residential tower, a contractor drops timber formwork and invests in aluminium shuttering such as Mivan. The system lets the crew pour the walls and slabs together, which cuts the floor cycle from 14 days to 7 days.

In SuperWise

Subcontractors bill formwork by contact area in sq.m, so shuttering is a BOQ item measured in sq.m. In SuperWise the engineer records the area in a measurement sheet against that item and the work order, with a deduction for openings, and the sheet computes the net quantity. The approved quantity feeds the RA bill, where the cumulative billed quantity cannot pass the work order quantity.

Digital measurement book

See SuperWise on your own project

Book a demo and we walk through your site data.