# Construction management software with AI

> Construction management software for contractors, developers and PMCs in India, with schedules, DPRs, purchases and RA bills in one record since 2015.

Canonical: https://superwise.site/
Last updated: 2026-11-03

**Every site. Every day. On record..** SuperWise is construction management software for Indian contractors, developers and PMCs. Site teams log progress, deliveries and measurements from their phones; the office approves, buys and bills from the same record.

## The slab was cast on Tuesday. The office heard on Friday.

The cement was “delivered”. Nobody counted the bags.

The RA bill waited three weeks for one measurement sheet.

**SuperWise closes that gap.** What happens on site goes on record as it happens, with a photo, a location and a time, and everyone from the store keeper to the director works from the same record.

[See how it works](https://superwise.site/platform/)

## Run the site from the office. Without a single phone call.

### Know what happened on site today. Not at the monthly review.

Engineers update tasks from their phones as the work happens. The daily progress report writes itself, and the schedule shows any delay against its baseline.

- Every update carries a photo, a GPS location and a time
- Progress is logged against the approved schedule and its baseline

[Site reporting](https://superwise.site/features/construction-site-reporting/)

### Every bag of cement, accounted for.

Indent, purchase order, delivery challan and supplier bill are one chain. The gate checks each truck against the order, and the bill can only claim what the site accepted.

- Short deliveries show against the order at the gate, not at month end
- Three photos per delivery: the loaded vehicle, the empty one and the material
- Supplier bills reconciled to accepted deliveries

Video (15 s, no sound): A material indent waits in the purchaser's queue, and the purchase order form opens filled in from it. The purchaser adds the supplier and submits; the approver accepts it on the phone, and the list shows the order Accepted.

[Material management](https://superwise.site/features/material-management/)

### RA bills built from measurements, not memory.

Measurements recorded on site feed the running account bill line by line, so your billing engineer checks quantities instead of chasing them.

- Measurement book linked to BOQ items and the work order
- Each bill moves from draft to submitted, approved and paid
- Retention and mobilisation advance applied from the work order

[RA bill certification](https://superwise.site/features/ra-bill-certification/)

## AI in SuperWise today

The help agent is in the portal today. An AI schedule builder is in development.

### Help agent

The help agent answers questions about SuperWise from the product guide. It can also act for the signed-in user in narrow ways: draft a purchase order or a material indent, log task progress, generate a DPR link, raise a site issue, or validate and import a bulk CSV. Actions follow the user's portal privileges, and the portal API enforces them.

### AI schedule builder (in development)

The builder talks through a project with the project manager, then drafts schedule templates and playground nodes from the conversation.

[See how SuperWise uses AI](https://superwise.site/platform/ai/)

## Built for the people who answer for the project.

- [Contractors](https://superwise.site/roles/construction-contractors/). Protect your margin on every package: materials, labour and bills tied to what was built.
- [Developers](https://superwise.site/roles/real-estate-developers/). See every tower, every week, without a site visit, and know which one needs you.
- [Project management consultants](https://superwise.site/roles/construction-pmc/). Certify progress and bills with evidence from site, not phone calls.

## Customers in their words

> …We are taking up projects at locations that we wouldn’t have been able to manage without the new “SuperWiser” we hired.
>
> Rohit Pandit, Director, Skylark Constructions

[Read customer stories](https://superwise.site/case-studies/)

## Templates and guides

Formats and checklists for the documents site teams fill in, with notes on what each should capture.

- [Construction daily report template](https://superwise.site/templates/construction-daily-report-template/). What a daily progress report should capture, and when an app does it better than a sheet.
- [RA bill format and template](https://superwise.site/templates/ra-bill-format-template/). What an RA bill format should include and the checks that support certification.
- [Construction hindrance and delay log](https://superwise.site/templates/construction-hindrance-delay-log/). How to structure a hindrance log so it supports project reviews and claim preparation.

[See all templates](https://superwise.site/templates/)
