# Quick Setting Cement Uses

> Quick setting cement sets in 5 to 30 minutes. See how it plugs leaks and how a site raises a material indent for it in SuperWise.

Canonical: https://superwise.site/glossary/quick-setting-cement/
Last updated: 2026-11-01

A Portland cement variant with accelerators that sets within minutes, used to plug leaks and for emergency repairs.

## What is Quick Setting Cement?

Quick Setting Cement is a variant of Portland cement made to harden fast. It contains less gypsum, which normally slows setting, plus chemical accelerators such as aluminium sulphate, so it reaches initial set in as little as 5 minutes and final set in 30 minutes, against the hours that normal [OPC](https://superwise.site/glossary/ordinary-portland-cement/) needs.

## Practical example

During construction of a deep basement, the contractor hits an underground aquifer, and water pours through a crack in the retaining wall. Standard cement would wash away. The team mixes a small batch of quick setting cement and plugs the hole. It hardens into solid, waterproof rock in about 5 minutes and stops the leak.

## In SuperWise

Quick setting cement is bought in small quantities for repairs. A [site engineer](https://superwise.site/glossary/site-engineer/) raises a [material indent](https://superwise.site/glossary/material-indent/) for it with the quantity, a required-by date and a description of the purpose, plus photos, and links the indent line to the [BOQ](https://superwise.site/glossary/bill-of-quantities/) item of the repair work, such as the retaining wall. Procurement then accepts the indent and converts it to an RFQ or a purchase order.

[Material management](https://superwise.site/features/material-management/)

## Related terms

- [Ordinary Portland Cement (OPC)](https://superwise.site/glossary/ordinary-portland-cement/)
- [Material Indent (Purchase Requisition)](https://superwise.site/glossary/material-indent/)

## Related
- [Ordinary Portland Cement (OPC)](https://superwise.site/glossary/ordinary-portland-cement/)
- [Material Indent (Purchase Requisition)](https://superwise.site/glossary/material-indent/)
- [Material management](https://superwise.site/features/material-management/)
